You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

VARIO GT 24 Girder Wall Formwork

Overview

With girder wall formwork, the arrangement of the individual system components can be freely selected. As a result, the VARIO GT 24 can be adapted to suit all geometries and requirements, e.g. tie positions or acceptable fresh concrete pressure. The system is used as project formwork in residential and industrial construction, bridge abutments and retaining walls as well as in particular for architectural concrete parts.

Adaptable to suit all requirements
through the variable arrangement of formwork girders and walers

Also for architectural concrete executions
due to the freely-selectable tie positioning and joint arrangement in accordance with the planning specifications

Continuous adjustment
through the elongated holes in the walers and couplings with flush, aligned and tight panel connections


Technical Details

  • Flexible wall formwork with the main components: GT 24 Formwork Girder, SRZ / SRZ / SRU Steel Walers, formlining and related connecting parts
  • Project-related planning and assembly
  • Flexible panel heights, determined by the length of the GT 24 Girder (standard lengths 0.90 m to 6.00 m in 30 cm increments; special lengths up to 17.80 m)
  • Flexible panel widths, determined by the length of the SRZ / SRU Steel Walers
  • Minimizing the number of formwork girders due to their high bending rigidity and load-bearing capacity
  • Project-specifific construction, adaptable for accommodating a very high maximum fresh concrete pressure
  • Elongated holes in the steel walers and panel couplings allow 100 % tension and compression-proof panel connections resulting in tight panel joints

Brochure Download

Peter O'Grady
Project Manager

PERI, as a system, in my opinion, was the best option for this project. From the product itself through to the drawing design, sales team and competitive rates, they were a pleasure to work with.

The proprietary SK tie system along with the decreased number of tie points on the Maximo form system meant there was less potential for leaks and thus limiting Monford Groups liability for reworks.
All different PERI systems used on the project works effortlessly together reducing the need for conventional make-up pieces and it was easy to switch from one system to the other. The RUNDFLEX system makes curves consistent and without imperfections.

I would highly recommend the entire PERI range of products as being user-friendly, quick to assemble and value for money and will continue to use PERI for future projects.

Project report