This section of the rail tunnel passed through a national park and was originally proposed as a bridge. Due to community concerns they decided to tunnel below the national park. Cut and cover was the proposed method as the tunnel roof was just below the river bed.
Constructed in three stages and three separate sections, the base, the walls and the roof.