JKG Tower at Jalan Raja Laut, Malaysia
Project data
Location: Kuala Lumpur, Malaysia
- JKG Tower high-rise complex, 32-storey office tower and 13-storey parking facility
- Completion of shell in approx. 26 months
Requirements
- High safety requirements
- Tight schedule called for completion of 3 floors per month
- Tight budget restraints
- Varying floor heights of 4.30 m through to 6.00 m
- Different slab thicknesses of up to 1 m
Customer
/master/projects/jkg-tower-at-jalan-raja-laut
Benefit to customer
- Increased safety and productivity through trained and safe handling of the PERI systems
- Pleasant, stress-free and safe working conditions at great heights through an air-permeable enclosure
- Mobile self-climbing devices for the protection panel reduced all crane requirements
- Fast storey construction time of 3 floors per month
Kim Fook Wong
Construction Manager
Together with the PERI engineers, we developed a very effective and efficient solution for this unique project. Thanks to the PERI system solutions, we could maintain the fast construction cycles. The PERI RCS P climbing protection panel also enhanced the safety measures on the jobsite. In addition, the support provided by PERI regarding the organization and implementation of on-site safety training increased the all-round safety for the construction crew as well as raising the productivity.
PERI solution
- Complete solution, complemented by planning services and a PERI supervisor on site
- Individual safety training for the construction team on the jobsite
- Fast and cost-effective realization of the core walls with VARIO GT 24 girder wall formwork on CB 240 climbing brackets
- Adapting to project-specific requirements with PERI RCS rail climbing system
- RCS P climbing protection panel as anti-fall protection at great heights
- Easy adaptation to suit the varying floor heights of 4.30 m to 6.00 m with PERI PD 8 slab tables