Midfield Terminal Building, United Arab Emirates
Project data
Location: Abu Dhabi, United Arab Emirates
- X-shaped airport terminal building (Midfield Terminal Building MTB), situated between two runways, with capacity for 65 large aircraft
- 50 m high seven-storey central structure (Central Processor) with a total area of 700,000 m²
- 12,000 laborers at site working in shifts
- Scheduled opening in 2017 for up to 30 million passengers annually
Requirements
- Quick processing 700,000 m³ concrete and 200,000 t steel
- Completion of all structural works in 18 months only
- In-sequence delivery of huge material quantities
- Realisation of varying slab geometries and heights
- Possibility to handle formwork and scaffolding manually due to limited crane disposability
Customer
TAV, Consolidated Contractors Company (CCC) and Arabtec Construction Joint Venture
Benefit to customer
- Prompt availability of material
- Quick moving of the slab formwork
- Reduction in crane usage
- Simple adjustments to the shoring tower heights
- Problem-free working also for inexperienced personnel due to simple handling and robust materials
PERI solution
- Delivery of large quantities of materials at very short notice
- 65,000 m² on-site formwork requirements (6,200 PD 8 slab tables)
- Use of robust and straightforward systems
- Beam solution with PD 8 slab tables and LIWA side formwork
- Slab tables moved by means of transportation trolleys
- Project formwork for 4,000 columns with edge lengths/diameters 1.00 – 2.50 m on the basis of VARIO and SRS
- Flexibly adaptable formwork and scaffolding solutions to accommodate the range of dimensions
- Flexible engineering for adapting to planning and construction progress changes