The Project
Impressions from the project process
After receiving designs from PERI Australia and several competitors we found PERI to have the most efficient design with components that were easily managed either manually or using small cranes. With the restricted footing space on site the cantilever support soffit was designed so that it could be assembled on ground and lifted in using a mobile crane which reduced high-risk construction work over the Georges River. Both assembly and dismantling of the falsework happened without issues, even though the soffit of headstocks are not level the various jacking heights through the falsework did not require amending from design to reach correct heights.
Lavinus O'Hagan
Project Manager