Torre Agbar, Spain

Project data

Location: Barcelona, Spain

Impressive office tower with oval-shaped core and facade walls

Height: 142 m
Storeys: 35 upper floors and 4 basement floors
Construction period: 1999 - 2004

Requirements

Impressive office tower with oval-shaped core and facade walls

Height: 142 m
Storeys: 35 upper floors and 4 basement floors
Construction period: 1999 - 2004

Customer

Dragados, Barcelona, Spain

Benefit to customer

  • achieving a regular 5-day cycle
  • fast and safe working
Torre Agbar Statement - Luis Danoz, Construction manager
Luis Danoz
Construction manager

The safety and fastness of the PERI systems have really impressed me, because despite the difficult structure of the building, we were able to complete one floor height every five days, in a regular cycle. I don’t think there is any other system that would have made a similarly high output possible!

PERI solution

  • self-climbing solution with ACS for core and facade
  • combination of the ACS variations ACS R, ACS G and ACS P for the core
  • ACS R and VARIO with adjustment to the different radii and changes in wall thicknesses
  • positioning of the anchoring between the unevenly spread openings
  • co-climbing of the placing boom
  • enclosure with safety nets